A rewire is one of the biggest electrical jobs a homeowner faces. It’s also one of the most important—old wiring is a fire hazard. Here’s everything you need to know.
Why rewire? Five signs it’s time
- The house is 40+ years old. Wiring degrades over time. Old cables lose insulation, connections corrode, and the whole system fails under modern demand.
- Frequent tripped switches or breakers. Means the system is overloaded or there’s a fault.
- Flickering lights or dead sockets. Signs of loose connections or failing circuits.
- You smell burning or see scorch marks. Get an electrician immediately—this is dangerous.
- You’re renovating or extending. Adding new circuits while the rest of the house is aging risks mixing incompatible systems.
Cost: What to expect
A typical 3-bedroom house rewire costs £3,500–8,000 depending on:
- Size of the house (2-bed vs. 5-bed)
- Ease of access (cavity walls easier than solid brick)
- Whether you replace the fuse board with a modern consumer unit
- Whether you add new circuits or sockets
Larger homes or listed buildings with thick walls or listed-building restrictions can cost £10,000+. Always get three quotes.
Phasing: Minimize disruption
You don’t have to shut everything down at once. A good electrician will phase the work—rewiring room by room so you keep power to the kitchen, bathroom, and living areas. This typically adds 2–3 weeks to the timeline but makes life manageable.
Timeline: How long?
A full house rewire typically takes 3–5 weeks for a 3-bedroom house, working 5 days a week. Larger homes or complex layouts can stretch to 8–10 weeks. The electrician will need to:
- Remove old cables and sockets
- Install new cabling through walls and ceilings
- Install new sockets, switches, and lighting
- Test the whole system and certify the work
Will my walls be damaged?
Most rewires use existing cable routes to avoid unnecessary damage. But expect some chasing (cutting channels in walls for new cables). A good electrician will make good the walls after—you may need a plasterer for finishing.
Do I need Building Regulations approval?
Yes. A rewire is a notifiable work under Building Regulations. The electrician must register it (either through NICEIC or the local authority). They’ll test the installation and provide you with certification. This is not optional—it’s your legal protection and your insurer’s requirement.
Bottom line: Budget £4,000–7,000, plan for 4 weeks of disruption, and hire a NICEIC electrician. A safe, modern wiring system is worth it.